● Scope — included
- 01·Field-test all existing exit devices against 15-lb force requirement
- 02·Repair / rebuild / replace (rim, mortise, surface vertical rod, concealed vertical rod)
- 03·Electrified kits (latch retraction, request-to-exit, delayed egress 15/30-sec)
- 04·Trim, rose, and push-pad replacement — matched finish
- 05·Fire-rated vs. non-rated distinction honored on spec + install
- 06·Adjustment reports with before/after force measurements
● Request
What's broken?
Describe the opening and the failure mode in one sentence. If you have a citation, paste the reference — we'll come back with a scoped quote.
- 01Response within one business day
- 02Same-day dispatch for emergency egress
- 03No sales sequences — we respond or we don't